Get Adobe Flash player

Major Refurbishment

Some Major Refurbishment Work

Work included survey of existing structures, strength evaluation , designing remedial measures and supervision.
Notably are:-

1)

Bridge near Milk Plant for KDA
(Structural strengthening of existing bridges to avoid demolition)

1991
2) 12 Storeyed Commercial Building
Structural modification required during construction due to bad quality cement.
1994
3)

Bridge on Rashid Minhas Road for KDA
Structural strengthening of slab to overcome punching of holes.

1995
4) Faiza Height Flats
Structural changes in six existing building (overcome deficiencies).
1996
5) 10 Storeyed Apartment Building Structural Modification to conform to latest earthquake code. 2003
6) Industrial Building for Dyeing and Printing
Structural Modification to convert existing G+1 storeyed building to G+3
2002-3
7) Memon Medical Institute
Structural modification to bring the structure to standard level both for Earthquake as well as other loads.
2004
8) Gulf Tower Shopping Center and Appartments
Structural modification to bring the structure to standard level both for Earthquake as well as other loads.
2009
9) Cliff Tower Shopping Center and Appartments
Structural modification to bring the structure to standard level both for
Earthquake as well as other loads.
2009
10) Residential Building adjustment in columns in basement to ease car parking problem.   2010
     
     
     

Calender 2021

November 2024
M T W T F S S
 123
45678910
11121314151617
18192021222324
252627282930